All Categories
Featured

Comprehensive water recycling, with 70-80% percent of stormwater overflow from around the site filtered through natural wetlands and mechanical systems, and after that utilized to water the surrounding parkland. 4,609,504 gallons of rainwater recorded annually. Annual carbon emissions reduction due to planting location of about 240,000 pounds of CO2 sequestered by trees on site 16.65 acres of total planting location (5.4 acres at SoFi Arena, 2.75 acres at Lake Park, and 7 acres of streetscape planting, amongst others 6-plus miles of new trails and courses (4.17 miles of enhanced direct streetscape consisting of pathways, 1.89 miles of brand-new multi-use tracks, and about 2,300 direct feet of brand-new Class II on-street bikeways) More details in the full news release listed below: a near 300-acre sports and home entertainment location being established by dealt with a landscape architecture and city style studio, to produce civic and environmentally conscious landscape services throughout three crucial locations: water capture and reuse, the usage of one hundred percent Southern California-native plant species, and the continued advancement of public parks for year-round use.


Influenced by the initial water feature that was part of the former Hollywood Park racetrack, Lake Park includes an upper and lower lake separated by cascading waterfalls. At around 6 acres and 16 million gallons of water, the lake is surrounded by an additional 6 acres of parkland. The lake works as a water recycling system by collecting 70-80 percent of stormwater runoff from around the site, filtering it through natural wetlands and mechanical systems, and after that using it to water the surrounding parkland.
Latest Posts

Maximizing Water Efficiency in California Climates

Local Maintenance Hub Standards in Southern California

Navigating 2026 ESG Benchmarks in SoCal